Hasil (
Bahasa Indonesia) 1:
[Salinan]Disalin!
The Contractor shall, if required by the Engineer, searchfor the cause of any defect, under the direction of theEngineer. Unless the defect is to be remedied at the cost ofthe Contractor under Sub-Clause 11.2 [Cost of RemedyingDefects], the Cost of the search plus profit shall be agreedor determined by the Engineer in accordance with Sub-Clause 3.5 [Determinations] and shall be included in theContract Price.
Sedang diterjemahkan, harap tunggu..