Hasil (
Bahasa Indonesia) 1:
[Salinan]Disalin!
SCOPE OF DOCUMENTPT. UTEC Survey Indonesia (Sub Contractor) has been contracted by PT. TimasSuplindo (Contractor) to provide survey services on-board HILONG 106 and DLB01including their dedicated AHTs. This document covers exclusively the Survey andPositioning Procedure for the Pipelay Installation, Platform Installation by the HILONG106 and associated Spools and Risers by the DLB01.1.2.1 HILONG 106 Survey and PositioningThis document explains the survey procedure for offshore pipe laying operation for the 6”production PHE-24 to KE5 CPP, 8” production PHE-12 to CPP2 pipeline and 6” gas liftpipeline CPP2 to PHE-12; the PHE-12, PHE-24 and CPP2 platform installations andmodifications to the KE-5 CPP platform using the HILONG 106. Below is the detail scopethat will be covered in this survey procedure: Mobilization of all required survey equipment on-board HILONG 106 and 2 x AHTs Mobilization of survey personnel on-board HILONG 106 during the offshore work DGPS Verification and Gyro Calibration during the mobilization Assist in the safe set up of the HILONG 106 and its anchor pattern at work site Provide complete survey support during the HILONG 106 operations as below: Anchor Handling Barge Positioning Pipeline Initiation Pipe lay Operations Pipeline Laydown Touchdown monitoring Advise on position and heading direction corrections to the HILONG 106 anchoroperators to ensure the pipeline stays within the required lay corridor Displaying of the theoretical touchdown point of the pipeline on the seabed using theposition of a known point on the HILONG 106 and data supplied by on-board fieldengineer Provide subsea positioning of the ROV during Touch Down Monitoring and othersubsea operations Provide survey support during Caisson Pile and Jacket Installation as below: Caisson Pile installation Caisson Pile Verticality Caisson Pile Cut to Length Platform Installation and orientation Platform Levelling Topside orientation on Levelling Submission of the survey and positioning reports including daily progress reports,mobilization reports, calibration reports, field reports, survey reports, anchor logs andsurvey pipeline tally.
Sedang diterjemahkan, harap tunggu..
