Dear Sir,
At this present time the GIS side doors just seem to have a simple key lock arrangement.


As you are aware the GIS Building houses substantial 800mm copper cables, extremely high value. Two circuits, GIS -Main Transformer 2 and GIS ~Main Transformer 3 have not as yet been terminated. This can be clearly seen where the single core cables are adjacent to their respective transformers.

All it would need is a team of professional thieves to enter the building though one of the side doors wherethey could then carry on their work undetected!! In the GIS cable basement is clearly obvious that six single core cables are dead because the cable terminations have not yet been made off. But in any case as long as the PLTU Celukan Bawang is without an incoming supply than all the cables are dead!!!


Once inside the GIS building the thieves could probably gain access to the basement through the three existing unused cable access openings. Once in the basement they could cut up the cables, stripping off the insulation and carrying out the copper cable core. All they would then need to do is exit the site over the fence on the southern boundary behind the GIS (This means of disposing of other site materials has already been seen in broad daylight and reported to the Security Staff)


Solution:

All the doors should be fitted with a substantially reinforced locking arrangement. Also CCTV coverage should be arranged and monitored back in the main control room.
0/5000
Dari: -
Ke: -
Hasil (Bahasa Indonesia) 1: [Salinan]
Disalin!
GIS BUILDING SECURITY AND SECURE LOCKING ARRANGEMENTS
Dear Sir,
At this present time the GIS side doors just seem to have a simple key lock arrangement.


As you are aware the GIS Building houses substantial 800mm copper cables, extremely high value. Two circuits, GIS -Main Transformer 2 and GIS ~Main Transformer 3 have not as yet been terminated. This can be clearly seen where the single core cables are adjacent to their respective transformers.

All it would need is a team of professional thieves to enter the building though one of the side doors wherethey could then carry on their work undetected!! In the GIS cable basement is clearly obvious that six single core cables are dead because the cable terminations have not yet been made off. But in any case as long as the PLTU Celukan Bawang is without an incoming supply than all the cables are dead!!!


Once inside the GIS building the thieves could probably gain access to the basement through the three existing unused cable access openings. Once in the basement they could cut up the cables, stripping off the insulation and carrying out the copper cable core. All they would then need to do is exit the site over the fence on the southern boundary behind the GIS (This means of disposing of other site materials has already been seen in broad daylight and reported to the Security Staff)


Solution:

All the doors should be fitted with a substantially reinforced locking arrangement. Also CCTV coverage should be arranged and monitored back in the main control room.
Sedang diterjemahkan, harap tunggu..
Hasil (Bahasa Indonesia) 2:[Salinan]
Disalin!
GIS BANGUNAN DAN KEAMANAN LOCKING SECURE PENGATURAN
Dear Sir,
Pada saat sekarang ini pintu samping GIS hanya tampaknya memiliki kunci pengaturan kunci sederhana. Seperti Anda ketahui rumah GIS Bangunan substansial kabel tembaga 800mm, nilai yang sangat tinggi. Dua sirkuit, GIS -Main Transformer 2 dan GIS ~ Main Transformer 3 belum belum dihentikan. Hal ini dapat dilihat dengan jelas di mana kabel single core yang berdekatan dengan trafo masing-masing. Semua itu akan butuhkan adalah tim pencuri profesional untuk memasuki gedung meskipun salah satu pintu samping wherethey kemudian bisa melanjutkan pekerjaan mereka terdeteksi !! Di ruang bawah tanah kabel GIS jelas jelas bahwa enam kabel single core mati karena terminasi kabel belum dibuat off. Tapi dalam hal apapun selama PLTU Celukan Bawang tanpa pasokan yang masuk dari semua kabel sudah mati !!! Sekali dalam GIS membangun pencuri mungkin bisa mendapatkan akses ke ruang bawah tanah melalui tiga ada kabel yang tidak terpakai bukaan akses. Setelah di ruang bawah tanah mereka bisa memotong kabel, menanggalkan isolasi dan melaksanakan inti kabel tembaga. Semua mereka kemudian akan perlu lakukan adalah keluar dari situs di atas pagar di perbatasan selatan belakang GIS (Ini berarti membuang bahan situs lain sudah terlihat di siang bolong dan dilaporkan kepada Staf Keamanan) Solusi: Semua pintu harus dilengkapi dengan pengaturan penguncian diperkuat secara substansial. Juga cakupan CCTV harus diatur dan dipantau kembali di ruang kendali utama.













Sedang diterjemahkan, harap tunggu..
 
Bahasa lainnya
Dukungan alat penerjemahan: Afrikans, Albania, Amhara, Arab, Armenia, Azerbaijan, Bahasa Indonesia, Basque, Belanda, Belarussia, Bengali, Bosnia, Bulgaria, Burma, Cebuano, Ceko, Chichewa, China, Cina Tradisional, Denmark, Deteksi bahasa, Esperanto, Estonia, Farsi, Finlandia, Frisia, Gaelig, Gaelik Skotlandia, Galisia, Georgia, Gujarati, Hausa, Hawaii, Hindi, Hmong, Ibrani, Igbo, Inggris, Islan, Italia, Jawa, Jepang, Jerman, Kannada, Katala, Kazak, Khmer, Kinyarwanda, Kirghiz, Klingon, Korea, Korsika, Kreol Haiti, Kroat, Kurdi, Laos, Latin, Latvia, Lituania, Luksemburg, Magyar, Makedonia, Malagasi, Malayalam, Malta, Maori, Marathi, Melayu, Mongol, Nepal, Norsk, Odia (Oriya), Pashto, Polandia, Portugis, Prancis, Punjabi, Rumania, Rusia, Samoa, Serb, Sesotho, Shona, Sindhi, Sinhala, Slovakia, Slovenia, Somali, Spanyol, Sunda, Swahili, Swensk, Tagalog, Tajik, Tamil, Tatar, Telugu, Thai, Turki, Turkmen, Ukraina, Urdu, Uyghur, Uzbek, Vietnam, Wales, Xhosa, Yiddi, Yoruba, Yunani, Zulu, Bahasa terjemahan.

Copyright ©2025 I Love Translation. All reserved.

E-mail: