The Contractor shall, if required by the Engineer, search
for the cause of any defect, under the direction of the
Engineer. Unless the defect is to be remedied at the cost of
the Contractor under Sub-Clause 11.2 [Cost of Remedying
Defects], the Cost of the search plus profit shall be agreed
or determined by the Engineer in accordance with Sub-
Clause 3.5 [Determinations] and shall be included in the
Contract Price.