This Sub-Clause shall apply to all tests specified in theContract, other than the Tests after Completion (if any).Except as otherwise specified in the Contract, theContractor shall provide all apparatus, assistance,documents and other information, electricity, equipment,fuel, consumables, instruments, labour, materials, andsuitably qualified and experienced staff, as are necessary tocarry out the specified tests efficiently. The Contractorshall agree, with the Engineer, the time and place for thespecified testing of any Plant, Materials and other parts ofthe Works.The Engineer may, under Clause 13 [Variations andAdjustments], vary the location or details of specified tests,or instruct the Contractor to carry out additional tests. Ifthese varied or additional tests show that the tested Plant,Materials or workmanship is not in accordance with theContract, the cost of carrying out this Variation shall beborne by the Contractor, notwithstanding other provisionsof the Contract.The Engineer shall give the Contractor not less than 24hours’ notice of the Engineer’s intention to attend the tests.If the Engineer does not attend at the time and place agreed,
Sedang diterjemahkan, harap tunggu..