GETTING ELECTRICITYWhat are the details?The indicators reported here f terjemahan - GETTING ELECTRICITYWhat are the details?The indicators reported here f Bahasa Indonesia Bagaimana mengatakan

GETTING ELECTRICITYWhat are the det

GETTING ELECTRICITY
What are the details?
The indicators reported here for Indonesia are based on
a set of specific procedures—the steps that an
entrepreneur must complete to get a warehouse
connected to electricity by the local distribution utility—
identified by Doing Business. Data are collected from the
distribution utility, then completed and verified by
electricity regulatory agencies and independent
professionals such as electrical engineers, electrical
contractors and construction companies. The electricity
distribution utility surveyed is the one serving the area
(or areas) in which warehouses are located. If there is a
choice of distribution utilities, the one serving the largest
number of customers is selected.
The procedures are those that apply to a warehouse and
electricity connection matching the standard
assumptions used by Doing Business in collecting the
data (see the section in this chapter on what the
indicators cover). The procedures, along with the
associated time and cost, are summarized below.
OBTAINING AN ELECTRICITY CONNECTION*
Name of utility -
Jakarta:
PT PLN
Name of utility -
Surabaya:
PT Perusahaan Listrik
Negara (PLN)
Price of electricity
(US cents per kWh) -
Jakarta:
14
Price of electricity
(US cents per kWh) -
Surabaya:
14
City: Jakarta, Surabaya
0/5000
Dari: -
Ke: -
Hasil (Bahasa Indonesia) 1: [Salinan]
Disalin!
GETTING ELECTRICITYWhat are the details?The indicators reported here for Indonesia are based ona set of specific procedures—the steps that anentrepreneur must complete to get a warehouseconnected to electricity by the local distribution utility—identified by Doing Business. Data are collected from thedistribution utility, then completed and verified byelectricity regulatory agencies and independentprofessionals such as electrical engineers, electricalcontractors and construction companies. The electricitydistribution utility surveyed is the one serving the area(or areas) in which warehouses are located. If there is achoice of distribution utilities, the one serving the largestnumber of customers is selected.The procedures are those that apply to a warehouse andelectricity connection matching the standardassumptions used by Doing Business in collecting thedata (see the section in this chapter on what theindicators cover). The procedures, along with theassociated time and cost, are summarized below. OBTAINING AN ELECTRICITY CONNECTION*Name of utility -Jakarta:PT PLNName of utility -Surabaya:PT Perusahaan ListrikNegara (PLN)Price of electricity(US cents per kWh) -Jakarta:14Price of electricity(US cents per kWh) -Surabaya:14City: Jakarta, Surabaya
Sedang diterjemahkan, harap tunggu..
Hasil (Bahasa Indonesia) 2:[Salinan]
Disalin!
MENDAPATKAN LISTRIK
Bagaimana rincian?
Indikator dilaporkan di sini untuk Indonesia didasarkan pada
satu set prosedur-spesifik langkah-langkah bahwa
pengusaha harus menyelesaikan untuk mendapatkan sebuah gudang
terhubung ke listrik oleh distribusi lokal utilitas yang
diidentifikasi oleh Doing Business. Data dikumpulkan dari
utilitas distribusi, kemudian selesai dan diverifikasi oleh
listrik peraturan lembaga dan independen
profesional seperti insinyur listrik, listrik
kontraktor dan perusahaan konstruksi. Listrik
utilitas distribusi yang disurvei adalah salah satu yang melayani wilayah
(atau daerah) di mana gudang berada. Jika ada
pilihan utilitas distribusi, satu porsi terbesar
jumlah pelanggan yang dipilih.
Prosedur adalah mereka yang berlaku untuk gudang dan
sambungan listrik yang cocok dengan standar
asumsi yang digunakan oleh Doing Business dalam mengumpulkan
data (lihat bagian dalam bab tentang apa yang
menutupi indikator). Prosedur, bersama dengan
waktu serta biaya terkait, adalah sebagai berikut.
MEMPEROLEH AN CONNECTION LISTRIK *
Nama utilitas -
Jakarta:
PT PLN
Nama utilitas -
Surabaya:
PT Perusahaan Listrik
Negara (PLN)
Harga listrik
(sen AS per kWh) -
Jakarta:
14
Harga listrik
(sen AS per kWh) -
Surabaya:
14
Kota: Jakarta, Surabaya
Sedang diterjemahkan, harap tunggu..
 
Bahasa lainnya
Dukungan alat penerjemahan: Afrikans, Albania, Amhara, Arab, Armenia, Azerbaijan, Bahasa Indonesia, Basque, Belanda, Belarussia, Bengali, Bosnia, Bulgaria, Burma, Cebuano, Ceko, Chichewa, China, Cina Tradisional, Denmark, Deteksi bahasa, Esperanto, Estonia, Farsi, Finlandia, Frisia, Gaelig, Gaelik Skotlandia, Galisia, Georgia, Gujarati, Hausa, Hawaii, Hindi, Hmong, Ibrani, Igbo, Inggris, Islan, Italia, Jawa, Jepang, Jerman, Kannada, Katala, Kazak, Khmer, Kinyarwanda, Kirghiz, Klingon, Korea, Korsika, Kreol Haiti, Kroat, Kurdi, Laos, Latin, Latvia, Lituania, Luksemburg, Magyar, Makedonia, Malagasi, Malayalam, Malta, Maori, Marathi, Melayu, Mongol, Nepal, Norsk, Odia (Oriya), Pashto, Polandia, Portugis, Prancis, Punjabi, Rumania, Rusia, Samoa, Serb, Sesotho, Shona, Sindhi, Sinhala, Slovakia, Slovenia, Somali, Spanyol, Sunda, Swahili, Swensk, Tagalog, Tajik, Tamil, Tatar, Telugu, Thai, Turki, Turkmen, Ukraina, Urdu, Uyghur, Uzbek, Vietnam, Wales, Xhosa, Yiddi, Yoruba, Yunani, Zulu, Bahasa terjemahan.

Copyright ©2025 I Love Translation. All reserved.

E-mail: