Hasil (
Bahasa Indonesia) 1:
[Salinan]Disalin!
The Contractor shall institute a quality assurance system todemonstrate compliance with the requirements of theContract. The system shall be in accordance with thedetails stated in the Contract. The Engineer shall be entitledto audit any aspect of the system.
Sedang diterjemahkan, harap tunggu..
