Hasil (
Bahasa Indonesia) 1:
[Salinan]Disalin!
DGPS VerificationPrimary DGPS and secondary DGPS comparison/ checks shall be performed inaccordance with the SOP-004 GPS Procedure.The DGPS will be verified by comparing the observed antenna positions to knowncontrol points on the wharf. This activity may be conducted while the offshore vesselmobilizes in Loyang Offshore Supply Base, Singapore (HILONG 106). A survey totalstation will be set up over a known point at the wharf and the vessel DGPS antennaposition observed. Observations will be subsequently compared to the DGPS derivedposition.Prior to this activity, all vessel offsets in the NaviPac software must be zeroed to ensurethat the data logging recorded is from the DGPS antenna itself and not from any offsetson the vessel.For the DLB01, as the system has been verified from the earlier project, a transit fix bythe DLB01 AHT to the existing KE-5 CPP Platform will need to be conducted upon arrivalat work site.8.8.2 Gyro/Heading CalibrationThe Primary and Secondary heading calibration shall be performed in accordance withSOP-003 Gyro Calibration and Verification Procedure.The two Meridian Surveyor Gyros (Primary and Secondary heading) and DGPS Headingwill be calibrated against known ground control points on the wharf. This activity may beconducted while the offshore vessel mobilizes in Loyang Offshore Supply Base,Singapore (HILONG 106).For the DLB01, as the gyros has been calibrated from the earlier project, a SunObservation by land survey method will be conducted to ensure that both gyros arewithin the normal working tolerance and that the corrections (C-O) applied from theearlier project, are still acceptable.
Sedang diterjemahkan, harap tunggu..
